Haupt Field Stadium

 Site Purpose: Stadium Renovations

 Developer: Land Tek

Engineer: Colliers Engineering & Design

Home of the Clippers

Location: E Clinton St, Clayton, NJ 08312

Description: Clayton Public School District is excited to announce the Haupt Field Stadium renovations include new ADA accessible bleachers, all purpose turf field, new stadium parking lot, and a secondary fan entrance off of New Street. Estimated completion time for the project is June 2, 2023.

Aerial Drone Progression Report

Aerial Photo Gallery: Mouse over any image to see download options. Click on any image to display the Slideshow mode.

Slideshow Mode: View photos at your own pace. Use the forward/backward arrows or the mouse wheel to move between the images. Hold Shift Key down and scroll the mouse wheel to zoom in and out of the image.

Activate auto slideshow mode by selecting the Start Slideshow icon in the upper left corner. In auto mode, each image will be displayed for 3 seconds.  

Aerial 360 Virtual Tour

Take a virtual aerial tour of Haupt Field Stadium renovations. 

Click and swipe on the image to rotate the view. Use the mouse wheel to zoom in and out. 

Construction Site Orthomosaic - January 16, 2023 & January 22, 2023

The view below contains two images. One image shows site progression as of January 16th. The second image shows site progression as of January 22nd. Move the slider right or left to view full orthomosaic images.

Haupt Before 01 16 2023Haupt After 01 22 2023

Disclaimer

Please note, Aerial View Advantage does not have a licensed land surveyor on staff to provide survey grade analysis. Aerial View Advantage can collect data and provide to your licensed surveyor for review and analysis. This is not exclusive to Aerial View Advantage. All drone data collection services cannot interpret data unless they have a surveyor on staff.