Taco Bell - Mt. Laurel NJ

 Site Purpose: Franchisee of Taco Bell

 Developer: Summerwood Corporation 

 Contractor: JBS Allphase Construction

Think Outside The Bun

Location: 3220 RT-38 E, Mt. Laurel, NJ 08054

Description: Former home to a Beneficial Savings Bank branch. Located at the intersection of Rt. 38 and Walnut Drive. This intersection is just east of Hartford Road.

Aerial Drone Progression Reports

Summerwood Corporation - Taco Bell - Mt Laurel, NJ
August 28, 2021

This page has been created for Summerwood Corporation. For the duration of the Taco Bell project at 3220 RT-38 E, Mt. Laurel, NJ 08054, Aerial View Advantage will provide videos and stills of the job site’s progression.

Mt Laurel 08 28 2021 21
Mt. Laurel - August 28, 2021

Aerial 360 Virtual Tour

Take a virtual aerial tour of the Mt. Laurel site. There are 5 points of view (Roof Top, Front Entrance, Drive Thru, 6th Street and Rt. 38).

Click and swipe on the image to rotate the view. Use the arrows or dots to cycle through the different points of views. Go full screen by selecting the box in the upper right corner of the image.

Drone Progression Video

This video was captured during the August 28, 2021 visit.  Using the same flight path for each mission, a new video will be added during each visit to the job site to show progression.

Play Video

Final Aerial Video

This video shows an uninterrupted aerial video of the property just before the grand opening.

Job Site Aerial Photos

Still images produced on July 31, 2021 and August 28, 2021.

The order of the images is designed to first show the progress as of July 31st followed by the progress as of August 28th.  Dates are labeled in the lower left corner of each image.

Each image will display for 5 seconds and then move to the next image.  Viewers may opt to select the forward/backward arrows to move between the images at their own pace. If the viewer hovers the mouse over the image it will stop the slideshow. Removing the mouse from the image will resume the slideshow.

July 31, 2021
August 28, 2021
July 31, 2021
August 28, 2021
July 31, 2021
August 28, 2021
July 31, 2021
August 28, 2021
July 31, 2021
August 28, 2021
July 31, 2021
August, 2021
July 31, 2021
August, 2021
Previous slide
Next slide

Construction Site Orthomosaic - July 31, 2021 & August 28, 2021

The view below contains two images. One image shows site progression as of July 31st. The second image shows site progression as of August 28th. Use the slider to view each full orthomosaic image.

Before 07 31 2021After 08 28 2021

Disclaimer

Please note, Aerial View Advantage does not have a licensed land surveyor on staff to provide survey grade analysis. Aerial View Advantage can collect data and provide to your licensed surveyor for review and analysis. This is not exclusive to Aerial View Advantage. All drone data collection services cannot interpret data unless they have a surveyor on staff.